|
Helix Power Tower
Installation Instructions
(1996-2001 GM S-10/15 Pick-Up/Blazer/Jimmy 4.3L V-6
VORTEC
1996-2001 GM C/K 1500-2500 Pick-Up 4.3L V-6 VORTEC Part
#43015)
Important!
Read all instructions before you begin installation.
1.
Remove
air duct assembly and move it back towards the firewall to access the 3 bolts
attaching the throttle body to the intake manifold.
2.
Remove
the throttle cables & bracket from the throttle body and intake manifold.
3.
Remove
the 3 bolts securing the throttle body to the intake manifold. Save the back
bolt with the air duct mounting extension for assembly in a later step.
4.
Lift
the throttle body off the intake manifold.
5.
Install
the stud (provided with kit) in the rear bolt hole in the intake manifold.
6.
Install
the HELIX POWER TOWER with the O-ring side up.
7.
Reinstall
the throttle body and secure with the bolts included in the kit for the front
2 holes and the nut and washer on the rear stud. Torque to 6.25 ft/lbs.
IMPORTANT!! DO NOT OVER
TORQUE!
8.
Reinstall
the air duct hold clown adapter (saved from step 4) on the rear stud.
9.
Route
the throttle and cruise controls cables over the air conditioner line and
reinstall them on the throttle body.
10. Reinstall
the cable bracket to the throttle body with the original bolt into the intake
manifold with the 1.25" tall spacer and bolt provided.
11. Reinstall
the air duct assembly to the throttle body and secure with the original wing
nut.
Note: you may
notice an occasional high-pitched whistle while driving. This is normal.
|

|
Parts List
1 Helix Power Tower
2 6mmx120mm studs
1 6mmx80mm stud
3 6mm flat washers
5 6mm nuts
2 6mmx60mm bolt
2 50mm spacer
|
ASK
ABOUT OUR COMPUTER REPROGRAMMING FOR EVEN MORE HORSPOWER!
|